For framing, verify structural changes match plans, fasteners are correct, and penetrations sealed. For rough‑ins, confirm labeled circuits, pressure‑tested lines, and documented duct sealing. Checklists reduce ambiguity, making it obvious what must be complete before drywall, tile, or trim proceeds confidently.
Capture daily site photos, tag them to milestones, and pair with concise trade logs. When payment draw requests arrive, documentation reassures everyone that work matches scope and quality. Transparency shortens debates, speeds approvals, and preserves trust during long, multi‑phase journeys.
Freeze scope at gates unless safety or code demands a change. If inspiration strikes, route it through a clear change‑order path with cost, schedule impact, and dependencies. This discipline protects sequencing and prevents domino effects that silently steal weeks and dollars.